Amateur Extra E1C: Rules for special bands and operating abroad

These are the 12 official questions in group E1C of the 2024–2028 Amateur Extra question pool, with the correct answer marked and a plain-English explanation of why it's right. The real exam asks one question from this group.

Learn E1C step by step, freeRead a short lesson on rules for special bands and operating abroad, answer these questions as you go, and see why each answer is right.
  1. E1C01Question 1FCC 97.303

    What is the maximum bandwidth for a data emission on 60 meters?

    • A60 Hz
    • B170 Hz
    • C1.5 kHz
    • D2.8 kHz Correct

    Why: Data on 60 meters is limited to 2.8 kHz.

  2. E1C02Question 2FCC 97.117

    Which of the following apply to communications transmitted to amateur stations in foreign countries?

    • AThird party traffic must be limited to that intended for the exclusive use of government and non-Government Organization (NGOs) involved in emergency relief activities
    • BAll transmissions must be in English
    • CCommunications must be limited to those incidental to the purpose of the amateur service and remarks of a personal nature Correct
    • DAll these choices are correct

    Why: Foreign contacts must be incidental to amateur radio or personal in nature.

  3. E1C03Question 3FCC 97.303(g)

    How long must an operator wait after filing a notification with the Utilities Technology Council (UTC) before operating on the 2200-meter or 630-meter band?

    • AOperators must not operate until approval is received
    • BOperators may operate after 30 days, providing they have not been told that their station is within 1 kilometer of PLC systems using those frequencies Correct
    • COperators may not operate until a test signal has been transmitted in coordination with the local power company
    • DOperations may commence immediately, and may continue unless interference is reported by the UTC

    Why: Operate after 30 days unless told you're within 1 km of power line carrier systems.

  4. E1C04Question 4

    What is an IARP?

    • AA permit that allows US amateurs to operate in certain countries of the Americas Correct
    • BThe internal amateur radio practices policy of the FCC
    • CAn indication of increased antenna reflected power
    • DA forecast of intermittent aurora radio propagation

    Why: An IARP lets US hams operate in certain countries of the Americas.

  5. E1C05Question 5FCC 97.221(c)(1), 97.115(c)

    Under what situation may a station transmit third party communications while being automatically controlled?

    • ANever
    • BOnly when transmitting RTTY or data emissions Correct
    • COnly when transmitting SSB or CW
    • DOn any mode approved by the National Telecommunication and Information Administration

    Why: Automatic stations may pass third-party traffic only when sending RTTY or data.

  6. E1C06Question 6

    Which of the following is required in order to operate in accordance with CEPT rules in foreign countries where permitted?

    • AYou must identify in the official language of the country in which you are operating
    • BThe US embassy must approve of your operation
    • CYou must have a copy of FCC Public Notice DA 16-1048 Correct
    • DYou must append "/CEPT" to your call sign

    Why: Under CEPT you must carry a copy of FCC Public Notice DA 16-1048.

  7. E1C07Question 7FCC 97.303(g)

    What notifications must be given before transmitting on the 630- or 2200-meter bands?

    • AA special endorsement must be requested from the FCC
    • BAn environmental impact statement must be filed with the Department of the Interior
    • COperators must inform the FAA of their intent to operate, giving their call sign and distance to the nearest runway
    • DOperators must inform the Utilities Technology Council (UTC) of their call sign and coordinates of the station Correct

    Why: Give the UTC your call sign and station coordinates.

  8. E1C08Question 8FCC 97.213

    What is the maximum permissible duration of a remotely controlled station’s transmissions if its control link malfunctions?

    • A30 seconds
    • B3 minutes Correct
    • C5 minutes
    • D10 minutes

    Why: A remote station must stop within 3 minutes if its control link fails.

  9. E1C09Question 9FCC 97.307

    What is the highest modulation index permitted at the highest modulation frequency for angle modulation below 29.0 MHz?

    • A0.5
    • B1.0 Correct
    • C2.0
    • D3.0

    Why: Below 29 MHz the modulation index can be at most 1.0 at the highest modulating frequency.

  10. E1C10Question 10FCC 97.307

    What is the maximum mean power level for a spurious emission below 30 MHz with respect to the fundamental emission?

    • A- 43 dB Correct
    • B- 53 dB
    • C- 63 dB
    • D- 73 dB

    Why: Spurious emissions below 30 MHz must be at least 43 dB below the fundamental.

  11. E1C11Question 11FCC 97.5

    Which of the following operating arrangements allows an FCC-licensed US citizen to operate in many European countries, and amateurs from many European countries to operate in the US?

    • ACEPT Correct
    • BIARP
    • CITU reciprocal license
    • DAll these choices are correct

    Why: CEPT lets US and many European hams operate in each other's countries.

  12. E1C12Question 12FCC 97.305(c)

    In what portion of the 630-meter band are phone emissions permitted?

    • ANone
    • BOnly the top 3 kHz
    • COnly the bottom 3 kHz
    • DThe entire band Correct

    Why: Phone is allowed across the entire 630-meter band.